Description
- High-concerned chemical: none
- Model Number: FSJ-093
- DIY Supplies: Paint & Decorating
- Brand Name: TEBM
- Origin: Mainland China
- Type: Sealers
- Certification: NONE
✨ Concrete Patch Powder Repair Mix
🔥 Core Advantages (Key Selling Points)
🛠️ Perfect for These Repairs
Driveway & Patio: Concrete spall repair, pothole filling, large-area surface damage on driveways, patios, and walkways.
Wall & Vertical Surfaces: Exterior concrete wall damage, step repairs, pillar and corner chipping, and vertical crack filling.
Large Cracks & Spalls: Fills wide cracks (>1/4 inch) and surface delamination that standard fillers can’t handle.
Indoor & Garage: Factory floor leveling, warehouse concrete repair, garage patching, and indoor surface damage fixes.
Outdoor & Commercial: Public sidewalk repairs, parking lot patching, and commercial concrete surface restoration.
📋 How to Use (4 Simple Steps)
Clean the Surface: Ensure all surfaces are clean, sound, and dry. Remove grease, dust, and loose particles with a wire brush or broom. No standing water or oil contamination allowed.
Mix the Powder: Add water to the dry powder at the recommended 1:1 ratio. Stir thoroughly with a trowel or mixing drill until a uniform paste forms with no dry lumps. Adjust consistency: stiffer for deep fill, slightly thinner for surface leveling.
Apply & Fill: Push the mixed material into the crack or hole using a trowel or putty knife, ensuring full coverage. For deeper holes, apply in layers. Tool the surface level and flush with the surrounding concrete.
Cure & Finish: Allow the repaired area to fully cure for at least 24 hours before additional applications or load-bearing. The surface can be painted after initial set (a few hours), but avoid heavy traffic until fully cured. Protect from rain during curing.
📦 Package Includes
1 × Concrete Patch Powder (100g / 300g / 500g optional)
Stirring Rod*1
Scraper*1
DISPOSABLE GLOVES*1
Gray color, matching existing concrete texture for natural blending.
💡 Warm Tips & Important Notes
Do not use on long-term load-bearing structures or soft silicone/PE/PP materials.
Protect the repair area from rain or intense sun during curing.
Store in a cool, dry place. Use within 1 month after opening for best performance.
For best results, apply in temperatures above the minimum recommended application temperature.

















Reviews
There are no reviews yet.